JOURNAL OF TEXTILE RESEARCH ›› 2011, Vol. 32 ›› Issue (6): 151-154.

Previous Articles     Next Articles

The standard time calculation of garment CAPP based on typical process

  

  • Received:2010-04-27 Revised:2011-01-30 Online:2011-06-15 Published:2011-06-15

Abstract: After analyzed with the present situation and various main factors which influenced Standard Time calculation of garment CAPP and the characteristics of the material and equipment. A method of calculating Standard Time based on typical process was presented, and expounded the methods of coding the typical process and the methods of calculating standard time quota of typical process and established a rule of selecting standard time quota of the typical process and the methods of calculating process time.

CLC Number: 

  • TS961.64
No related articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
No Suggested Reading articles found!