JOURNAL OF TEXTILE RESEARCH ›› 2018, Vol. 39 ›› Issue (06): 155-161.doi: 10.13475/j.fzxb.20170703008
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
For the empty slot, waiting, bottlenecks of one-piece flow assembly line and other phenomena in production, the optimization simulation of single production line was studied by using Flexsim software to improve optimization and forecasting efficiency. Based on the analyzing on the factors influencing the production balance of garment one-piece flwo, the influence of the personnel and production line on the single garment assembly line was anslyzed. Then, according to Flexsim simulation model garment single flow production line arrangement was established. Finally, taking a men's jacked one piece flow production line as an example, the men's jacket production line arrangement was optimized by changing the production and personnel arrangements and other methods. The results show that the line design efficiency and production efficiency are improved, and the feasibility of the Flexsim simulation model is effectively tested.
Key words: one-piece flow assembly line, Flexsim software, balancing optimization, simulation
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.fzxb.org.cn/EN/10.13475/j.fzxb.20170703008
http://www.fzxb.org.cn/EN/Y2018/V39/I06/155
Cited